Tomorrow morning is the start of our kitchen remodel. The kitchen is empty except for our fridge. I decided to cover kitchen related items with plastic and I also put plastic up on the opening between the kitchen and the formal dining room. Below will be the last of the "before" photos.
Home From Vacation And Gearing Up For The House Remodel
Veronica and I just returned from our most recent adventure. We went on a 7 day Avalon Waterways Rhine River cruise followed by a Globus 7 day Germany bus tour. I will have more about that vacation along with plenty of photos as time goes by.
We are gearing up for the start of our major house remodel. This upcoming Monday our kitchen renovation will commence. We will be without a kitchen for approximately a week if not longer. Previously I had posted "before" photos. The "after" photos will show the dramatic changes that were made.
Then on October 8 we will be starting the renovation and remodel of all of our bathrooms.
This all will be followed by a complete painting of all interior surfaces, then carpet and finally the hard wood flooring will go down.
We got lucky around here with Hurricane Florence missing us for the most part but because of the possibility of the next hurricane not being a near miss, I am seriously entertaining estimates for a whole house natural gas backup generator that would automatically kick on when the electricity goes out. It should be interesting to see what the labor and installation costs will be for the unit. More on this and photos of the renovation/remodel as time goes by.....
We are gearing up for the start of our major house remodel. This upcoming Monday our kitchen renovation will commence. We will be without a kitchen for approximately a week if not longer. Previously I had posted "before" photos. The "after" photos will show the dramatic changes that were made.
Then on October 8 we will be starting the renovation and remodel of all of our bathrooms.
This all will be followed by a complete painting of all interior surfaces, then carpet and finally the hard wood flooring will go down.
We got lucky around here with Hurricane Florence missing us for the most part but because of the possibility of the next hurricane not being a near miss, I am seriously entertaining estimates for a whole house natural gas backup generator that would automatically kick on when the electricity goes out. It should be interesting to see what the labor and installation costs will be for the unit. More on this and photos of the renovation/remodel as time goes by.....
A New Piece Of Travel Luggage
A few months ago I purchased a new camera and then a new lens to go with it. Then even more recently I bought an additional lens that would allow me to take much better low light photos. With all of this new equipment and the amount of travel that we take throughout the years, I decided to get a piece of luggage that would make it easier to carry my cameras and gear. I needed something that was relatively lightweight, water proof, something that I could carry on a plane but also something that would take a beating if I was unlucky enough to need to do a gate side check in.
What i ended up getting was a Pelican Air 1535 with padded dividers.
I was able to get everything into this piece of luggage and the dimensions fall in line with the airline size restrictions on carry on luggage.
Here are some photos of my new Pelican carry on luggage:
What i ended up getting was a Pelican Air 1535 with padded dividers.
I was able to get everything into this piece of luggage and the dimensions fall in line with the airline size restrictions on carry on luggage.
Here are some photos of my new Pelican carry on luggage:
Subscribe to:
Posts (Atom)